Angle-tear

“Offline [nuclear] reactors could lead to a ‘tense situation’ for energy supply in France, in the event of a cold snap this winter.
The situation is likely to be exacerbated by damage during Storm Angus to the main cable that carries electricity back and forth between the UK and France. It is believed a boat dropping anchor during the storm may have been responsible but National Grid is investigating the cause and working to repair the Interconnexion France-Angleterre, which is buried in the seabed and heavily armoured.” https://www.theguardian.com/environment/2016/nov/29/french-nuclear-power-worst-situation-ever-former-edf-director

‘Brexit means Brexit’ means severing all connections to the continent.

Advertisements

Noclearer

“The UK’s energy department, BEIS, today announced the go-ahead for the controversial Hinkley Point C (HPC) nuclear power plant in Somerset … [despite]
•its very high cost, more than double the current wholesale power price and far more than the current cost of even high-cost renewable power from offshore wind;
•security concerns over China’s involvement in core UK infrastructure;
•the lack of any single example of a working EPR reactor anywhere in the world;
•the severe delays, cost overuns and technical problems at all EPR construction sites;
•the low value of HPC’s contribution to UK energy supply in the new decentralised ‘smart grid’ era;
•and, common to all nuclear power, the continued absence of any solution to the nuclear waste problem.” (http://www.theecologist.org/News/news_analysis/2988131/hinkley_c_nuclear_goahead_may_caves_in_to_pressure_from_france_and_china.html)

“Ministers will impose a new legal framework for future foreign investment in Britain’s critical infrastructure, which will include nuclear energy and apply after Hinkley.” (https://www.gov.uk/government/news/government-confirms-hinkley-point-c-project-following-new-agreement-in-principle-with-edf)
After Hinkley?
“Hinkley Point C will provide seven per cent of Britain’s electricity needs for sixty years.”
Plus building and decommissioning time. So at least 100 years. If anyone can be bothered reviewing historical documents. If we haven’t extinguished ourselves by then. That’s a very long kick into very long grass.

“The Government will be able to prevent the sale of EDF’s controlling stake prior to the completion of construction, without the prior notification and agreement of ministers. This agreement will be confirmed in an exchange of letters between the Government and EDF.”
Who is this Government if it is not ministers?

“After Hinkley, the British Government will take a special share in all future nuclear new build projects.”
British Government, not UK. So, in 100 years, whatever artificial intelligence entity comprises Government is expected to have disintegrated the union of regions, if not yet detached from Europe.

“A new era of UK nuclear power – building on Britain’s strong nuclear legacy.”
That would be the nuclear waste, bequeathed to anyone left standing in 1000 years.

“The Contract for Difference would provide a set price of £92.50 per megawatt hour of electricity provided by Hinkley Point C for 35 years once it begins generating.”
Start betting on a very high rate of inflation.

“Is there anything wrong with this page?”
Er, yes.

Goosed

“The nuclear industry and the government claim Hinkley is a good option if we want to ‘keep the lights on’ – but is it really the golden goose they claim it to be?” (http://www.greenpeace.org.uk/blog/nuclear/five-reasons-why-hinkley-not-golden-goose-20160811)

Don’t be fooled by a tasty goose;
You’ll only get a basted noose.
The government’s playing fast and loose,
Through foreign investors’ ghastly truce,
With failed technology that faced misuse.
So even if it bakes your hoose,
All you’ll get from this hasty ruse,
Is wasted chance and pricey juice.
Whatever government excuse,
In truth, it’s all pure nasty goose.

Stuff the goose: please sign and share Greenpeace’s petition.

Unclear Nuclear

“When Hinkley [Point C, a planned new nuclear plant in Somerset, England] was first announced, we were told that electricity generated by the power station would be ‘cooking Christmas turkeys by 2017’.” (http://www.greenpeace.org.uk/blog/climate/8-reasons-george-osborne-let-hinkley-nuclear-go-20160216)

Not conventionally, of course, just any within a 100 mile radius.

Please sign Greenpeace’s petition asking Chancellor George Osborne not to waste £billions on this deeply flawed nuclear power project.

Opportunity Wind Blow

“While offshore wind is still favoured by ministers, the blow to onshore wind – which is much cheaper, and when carbon emissions are taken into consideration is cheaper than traditional fossil-fuel forms of generation – has been a cause of concern to wind investors.” (http://www.theguardian.com/environment/2016/feb/03/worlds-largest-offshore-windfarm-to-be-built-off-yorkshire-coast)

UK government may have misunderstood which sort of blow windfarms need.

Nuclear Confission

“A right-wing British government has invited companies controlled by the Chinese Communist Party – and in one case, the Chinese military – into the heart of the UK’s strategically vital energy infrastructure.” (http://www.theecologist.org/News/news_analysis/2986180/uks_nuclear_deal_with_china_is_a_boon_for_bankers_and_no_one_else.html)

Less Eco, more £.co

Potaturbine

“The new bio-refinery at 2 Sisters Food Group’s Carlisle factory is expected to produce 3,500 megawatt hours (MWh) each year in electricity and the equivalent of 5,000MWh in steam to help power the factory. The anaerobic digestion plants will use potato waste from the factory’s mashed potato and pie manufacturing lines as a feed stock.” (http://www.theguardian.com/environment/2015/sep/29/mashed-potato-to-power-food-factory)

Their other rotten potato products are destined for incineration.

Save the books you want from going to waste:
http://www.betterworldbooks.com/ | http://www.betterworldbooks.co.uk/